The booster station weighs 3130 tons, and our company is responsible for the entire logistics transportation, tooling design, and barge loading. In just 2 days, the dismantling, dispatching, carpooling, and pre work preparation were completed, and the roll on/roll off operation of the Yangjiang Shaba offshore wind power booster station was successfully completed in the early morning of May 15th.
Our company is responsible for the entire logistics transportation, tooling design, and barge loading of the booster station project. Each stage is closely linked and fraught with difficulties. The technical team has had multiple technical exchanges with the design institute during equipment construction and has been continuously following up to improve the transportation plan; The business team has coordinated multiple times with vehicles, ships, and docks to create favorable transportation conditions; The operation team works tirelessly to seize the deadline and ensure transportation safety. After overcoming multiple difficulties, the upper module of the booster station was successfully shipped and delivered, achieving the ultimate goal of the project.