Wuhan Yangzhenggu Iron Buddha Temple the Shakya ManiHall Translation Project

Zhonglian Haiguangying Logistics Engineering Co., Ltd  2021-01-03 projectdynamic
Today, our company successfully completed the translation project of the Shakya ManiHall of Wuhan Yangzhenggu Iron Buddha Temple, which is located in Huanghualao Town, Wuhan, adjacent to Huanghua Village. Due to the construction planning, a the Shakya ManiHall and a pagoda need to be self loaded from the original site foundation position, and transported to the new site about 190 meters away from the original site. 图片.png The the Shakya ManiHall moved this time is a historical and cultural relic protection building. The main hall is 30 meters long, 23 meters wide, and about 23 meters high, with a total construction area of about 2100 square meters and a weight of about 3000 tons. When lifting, the lower support structure of the building is made of concrete brackets, and the SPMT vehicle group is uniformly distributed according to the center of gravity position of the building body, and pressurized in a step-by-step loading form to ensure that the hydraulic pressure value of each SPMT group and the stroke value of the lifting oil cylinder are the same as much as possible. During the transportation process, in order to ensure the safety of multiple Buddha statues and murals inside the main hall and ensure the stability of transportation, a total station is equipped on site to measure the vehicle group and the posture of the main hall at various agreed points and make timely adjustments; To ensure the synchronization of all vehicle sets, the operation team uses hydraulic oil pipes to connect multiple sets of vehicles in series and partition them, so that the module roof rises synchronously. The vehicle is adjusted using multiple steering and self adjustment modes to ensure that the vehicle travels according to the predetermined trajectory and posture. After SPMT enters the landing area, use the four corner positioning points to align the arranged vertical points and adjust the horizontal position; Use a total station to calibrate and correct the pre drawn reference line of the main hall tray, and control the positioning accuracy within 5mm. nine hundred and one